We are building a new mineral fertilizer plant in Ukraine, with the full production cycle on a single site.
Zorya Khimsyntez Research and Production Enterprise LLC is building a new mineral fertilizer plant in Ukraine. Production launch is planned for Q4 2027.
We chose the harder but sounder model: a full production cycle rather than repackaging imported material. Sulphuric acid, nitric acid, neutralisation, granulation and bagging are all located on one site — which gives consistent quality, independence from imports and a predictable cost base.
The range is deliberately limited to three products; we prefer depth of quality to breadth of assortment. Sales launch is planned for Q1 2028.

About the plant
Production: from acid to granule
Sulphuric acid + ammonia → ammonium sulphate. Ammonium nitrate + ammonium sulphate → ammonium sulphate nitrate (ASN). Ammonium nitrate + limestone or dolomite → calcium ammonium nitrate. One feedstock loop, three products.
Acid production
An on-site sulphuric acid unit and nitric acid production form the feedstock base for the whole range.
Neutralisation
Neutralising acids with ammonia and combining the nitrogen base with sulphate or carbonate components produces feedstock for all three fertilizers.
Granulation and drying
A modern granulation line produces 2–5 mm granules with consistent strength and a minimal dust fraction.
Bagging and shipment
Automated filling into big bags and sacks, palletising, and shipment by truck.

Project figures
- 3
- Products in phase one
- 4
- Production cycle stages
- Q4 2027
- Production launch
- Q1 2028
- Sales launch
Project status
Where we are — and why sales have not started yet
The project is delivered in stages. Production launch is planned for Q4 2027 and sales launch for Q1 2028.
Stage 1 · current
Site preparation
Site preparation: land works, design engineering and utility readiness of the territory.
Current stage
Stage 2 · planned
Construction and installation
Civil works and installation of the sulphuric acid and granulation technological lines.
Planned
Stage 3 · 2027
Commissioning and certification
Cold and hot equipment testing and stabilising each production stage; product standards and technical specifications, declaration of conformity, state fertilizer registration and laboratory accreditation.
Planned
Stage 4 · Q4 2027 — Q1 2028
Sales launch and first shipments
Building the shipment schedule from pre-orders and ramping phase one up to design output.
Planned
Location and logistics
The production site is in Zakarpattia region, with direct highway access and no railway siding of its own. Shipment format, schedule and route are agreed individually with each buyer.
- Packaging in big bags and sacks
- Truck shipment with direct highway access
- Packaging agreed to buyer requirements
- Shipment to a schedule agreed with the buyer
Contacts
10 Staro-Kyivska Street, Building G, Office 135, Kyiv, 04116, Ukraine
Phone
Pre-sale
Be among our first buyers
Sales have not started yet. We are accepting pre-orders to build the shipment schedule for our first production runs. Submit a request and you will be among the first to receive a commercial offer.