We are building a new mineral fertilizer plant in Ukraine, with the full production cycle on a single site.

Zorya Khimsyntez Research and Production Enterprise LLC is building a new mineral fertilizer plant in Ukraine. Production launch is planned for Q4 2027.

We chose the harder but sounder model: a full production cycle rather than repackaging imported material. Sulphuric acid, nitric acid, neutralisation, granulation and bagging are all located on one site — which gives consistent quality, independence from imports and a predictable cost base.

The range is deliberately limited to three products; we prefer depth of quality to breadth of assortment. Sales launch is planned for Q1 2028.

Acid production

About the plant

Production: from acid to granule

Sulphuric acid + ammonia → ammonium sulphate. Ammonium nitrate + ammonium sulphate → ammonium sulphate nitrate (ASN). Ammonium nitrate + limestone or dolomite → calcium ammonium nitrate. One feedstock loop, three products.

01

Acid production

An on-site sulphuric acid unit and nitric acid production form the feedstock base for the whole range.

02

Neutralisation

Neutralising acids with ammonia and combining the nitrogen base with sulphate or carbonate components produces feedstock for all three fertilizers.

03

Granulation and drying

A modern granulation line produces 2–5 mm granules with consistent strength and a minimal dust fraction.

04

Bagging and shipment

Automated filling into big bags and sacks, palletising, and shipment by truck.

Granulation line

Project figures

3
Products in phase one
4
Production cycle stages
Q4 2027
Production launch
Q1 2028
Sales launch

Project status

Where we are — and why sales have not started yet

The project is delivered in stages. Production launch is planned for Q4 2027 and sales launch for Q1 2028.

  1. Stage 1 · current

    Site preparation

    Site preparation: land works, design engineering and utility readiness of the territory.

    Current stage

  2. Stage 2 · planned

    Construction and installation

    Civil works and installation of the sulphuric acid and granulation technological lines.

    Planned

  3. Stage 3 · 2027

    Commissioning and certification

    Cold and hot equipment testing and stabilising each production stage; product standards and technical specifications, declaration of conformity, state fertilizer registration and laboratory accreditation.

    Planned

  4. Stage 4 · Q4 2027 — Q1 2028

    Sales launch and first shipments

    Building the shipment schedule from pre-orders and ramping phase one up to design output.

    Planned

Location and logistics

The production site is in Zakarpattia region, with direct highway access and no railway siding of its own. Shipment format, schedule and route are agreed individually with each buyer.

  • Packaging in big bags and sacks
  • Truck shipment with direct highway access
  • Packaging agreed to buyer requirements
  • Shipment to a schedule agreed with the buyer

Contacts

10 Staro-Kyivska Street, Building G, Office 135, Kyiv, 04116, Ukraine

Pre-sale

Be among our first buyers

Sales have not started yet. We are accepting pre-orders to build the shipment schedule for our first production runs. Submit a request and you will be among the first to receive a commercial offer.

optional
optional
optional
optional
optional

Your data is used only to process this request.